Renewables · 2019 — present
Solar PV plants with a combined capacity of over 400 MWel
Design, construction and commissioning, including zoning plan approvals and coordination with the authorities.
Various clients
Construction Supervision Company
CSCom Ltd is the new name of a company that brings together a team with long experience in engineering consultancy services for construction.
Services
A wide range of services for delivering investment projects — from the first study to commissioning.
Feasibility studies and surveys of existing sites (due diligence).
Liaising with state and municipal authorities on permits, land acquisition, zoning regularisation and change of land use.
Preparing and processing Detailed Development Plans, and their amendments.
Supporting the client when screening whether an environmental impact assessment is required, and in preparing and processing it.
Preparing conceptual and technical designs.
Supervision during construction and commissioning of the works.
Managing construction contracts concluded by the client (EPCM, PMC+C).
Services ensuring safe working conditions on construction sites.
How we work
Our roles follow the stages of the investment, so the client works with a familiar team from the first sketch to the warranty period.
Stage 1
Feasibility studies, due diligence and viability assessment before the investment decision.
Stage 2
Zoning plans, EIA and liaison with the authorities through to the building permit.
Stage 3
Conceptual and technical designs; conformity assessment under Regulation (EU) No 305/2011.
Stage 4
Construction supervision, FIDIC Engineer, contract management, QA/QC and safety.
Projects
Renewables · 2019 — present
Design, construction and commissioning, including zoning plan approvals and coordination with the authorities.
Various clients
Gas infrastructure · 2019 — 2021
Quality consultant to Consortium Arkad for the linear section to the Bulgarian–Serbian border.
Bulgartransgaz EAD
District heating · 2017 — 2020
Design, construction and commissioning.
EVN Bulgaria Toplofikatsia EAD
Power generation · 2009 — 2013
Engineer under FIDIC rules for the refurbishment and construction of the FGD units.
ContourGlobal Maritsa East 3
Power generation · 2012 — 2016
Construction supervision and quality management during execution.
TPP Maritsa East 2
District heating · 2021 — present
Engineering consultancy for the construction and for new district heating pipeline routes.
EVN Bulgaria Toplofikatsia
Environment · 2015 — 2019
Gypsum storage facility and reclamation of the Beglig Chair ash pond.
TPP Maritsa East 2 · TPP Varna
Renewables · 2014 — 2016
EPCM — management of engineering, procurement and construction.
Bara Group EOOD · CEZ Bulgaria
Gas infrastructure · 2022 — present
Pre-design studies, due diligence and preparation of the zoning procedures.
Svishtov Municipality
Compliance
Harmonised conditions for the marketing of construction products, of the European Parliament and of the Council of 9 March 2011.
News
Projects
The team completed supervision and commissioning coordination within 14 months of the building permit being issued.
Read the article: 60 MWel solar PV plant commissionedRegulatory framework
A short review of the current harmonised conditions under Regulation (EU) No 305/2011 and what they mean for investment projects.
Read the article: Changes to conformity assessment requirementsCompany news
We are looking for engineers with experience in energy and infrastructure projects, for roles in Sofia and on site.
Read the article: We are growing our FIDIC contract management teamTechnology
How we moved to digital records and photo documentation for QA/QC inspections, and what our clients gained.
Read the article: Digital quality control on siteProjects
The scope includes due diligence of the existing infrastructure and preparation of the zoning plan procedures.
Read the article: Pre-design study for the gas supply of Svishtov beginsRegulatory framework
Practical notes from processing dozens of EIA screening requests in recent years.
Read the article: EIA: common delays and how to avoid themProjects
Successful 72-hour tests of the combined-cycle unit.
Read the article: Stage 2 of the EVN district heating cogeneration completedContact